Wait...
Search Global Export Import Trade Data
Recent Searches: No Recent Searches

China to build world’s largest artificial-island airport to handle 43 million passengers.


Date: 17-12-2024
Subject: China to build world’s largest artificial-island airport to handle 43 million passengers
China is constructing what will be the world’s largest artificial-island airport, the South China Morning Post (SCMP) reported, to enhance Dalian’s position as a regional transportation hub. The Dalian Jinzhouwan International Airport, currently under construction, will cover an impressive 20 square kilometers (7.72 square miles), as per the Liaoning provincial government’s official website.

Once completed, the new airport will surpass both Hong Kong International Airport, which spans 12.48 sq km, and Japan’s Kansai International Airport, measuring 10.5 sq km—both of which are located on artificial islands.

“For Dalian people to say it’s the largest, that’s exactly what it is,” aviation consultancy founder Li Hanming told SCMP.

Also read: Monkeys enter Singapore’s Changi Airport, viral video shows woman calmly ‘talking’ to one: ‘Give her an award’

The offshore Jinzhouwan Airport will serve the northeastern port city of Dalian, a hub for trade with neighboring Japan and South Korea due to its strategic location. Situated on a peninsula at the northern end of the Bohai Strait, the city of over 6 million people has grown into a center for oil refineries, shipping, logistics, and coastal tourism.

Also read: Bengaluru woman's 15-point pitch for new flatmate is viral: 'Cooler than your ex'

China's revolutionary sea-based airport
Jinzhouwan is the first airport in mainland China to be built entirely on an artificial offshore island. According to the provincial government, it will eventually house four runways and a massive terminal spanning 900,000 square meters (9.69 million square feet). The terminal will initially handle 43 million passengers annually—more than double the capacity of the existing Dalian Zhoushuizi Airport—and will expand to accommodate up to 80 million passengers per year.

Airports Council International, a global industry group based in Canada, said the airport will also manage one million tonnes of cargo annually once fully operational. The entire project is expected to cost $4.3 billion and is slated for completion by 2035.

Also read: Suri tribe bride adorns herself with goat horns, lip plates: Pakistani vlogger captures unique rituals

The Liaoning provincial government reported that, as of August, “deep foundation treatment” on a 77,000-square-metre reclamation area had been completed. Plans for further land reclamation and the terminal building’s foundations are also underway.

The current Dalian Zhoushuizi Airport, which opened nearly a century ago under Japanese occupation, has undergone multiple expansions but has now reached its maximum designed capacity. According to Xinhua, the airport handled 658,000 international passengers last year.

Li Hanming pointed out that the existing airport’s location in a valley, surrounded by mountains, makes it difficult for pilots to navigate, particularly in adverse weather. “Its location could make flights quite dangerous during adverse weather,” he said.
However, Li also cautioned that island airports come with unique challenges. “Island airports face a particularly high risk of being cut off if they are linked to natural land by single bridges,” he said, noting the vulnerability of such infrastructure to earthquakes, typhoons, or accidents like ship collisions.

China’s aggressive infrastructure expansion continues, with 22 new airports, collectively valued at $19.6 billion, under construction as of July, according to the CAPA Centre for Aviation, a market intelligence firm.

Once completed, the Dalian Jinzhouwan International Airport is expected to transform the region’s connectivity and solidify Dalian’s role as a vital hub for air transport and trade.

Source Name : Hindustan Times

Get Sample Now

Which service(s) are you interested in?
 Export Data
 Import Data
 Both
 Buyers
 Suppliers
 Both
OR
 Exim Help
+


What is New?

Date: 03-12-2024
Notification No. 48 /2024-Customs
Seeks to rescind Notification No. 32/2022-Customs dated 30th June, 2022.

Date: 18-11-2024
NOTIFICATION No. 26/2024–Central Tax
Extension of due date for filing of return in FORM GSTR-3B for the month of October, 2024 for the persons registered in the state of Maharashtra and Jharkhand

Date: 13-11-2024
Notification No. 77/2024-CUSTOMS (N.T.)
Fixation of Tariff Value of Edible Oils, Brass Scrap, Areca Nut, Gold and Silver- Reg

Date: 30-10-2024
Notification No. 73/2024-CUSTOMS (N.T.)
Fixation of Tariff Value of Edible Oils, Brass Scrap, Areca Nut, Gold and Silver- Reg

Date: 29-10-2024
NOTIFICATION No.71/2024- Customs (N.T.)
Notifying Ultapani LCS route Road from Ultapani via Saralpara via Naharani (SSB Camp) to Sarpang District (Bhutan) by amendment of Principal Notification No. 63/1994-Customs (N.T.) dated 21st November, 1994

Date: 23-10-2024
Notification No. 70/2024–Customs (N.T)
"Notification under Section 28A of Customs Act, 1962 for Non-Levy of Customs Duty on the import of Simply Sawn Diamonds

Date: 23-10-2024
Notification No. 69/2024-CUSTOMS (N.T.)
Fixation of Tariff Value of Edible Oils, Brass Scrap, Areca Nut, Gold and Silver- Reg.

Date: 22-10-2024
Notification No. 46/2024-Customs
[F. No. 190354/167/2024-TRU]

Date: 18-10-2024
NOTIFICATION No. 67/2024-Customs (N.T.)
"Notification of Yogayatan Port, Maharashtra as Customs Seaport" and it was issued under Section 7(1)(a) of Customs Act, 1962

Date: 15-10-2024
Notification No. 66/2024-CUSTOMS (N.T.)
Fixation of Tariff Value of Edible Oils, Brass Scrap, Areca Nut, Gold and Silver- Reg



Exim Guru Copyright © 1999-2024 Exim Guru. All Rights Reserved.
The information presented on the site is believed to be accurate. However, InfodriveIndia takes no legal responsibilities for the validity of the information.
Please read our Terms of Use and Privacy Policy before you use this Export Import Data Directory.

EximGuru.com

C/o InfodriveIndia Pvt Ltd
F-19, Pocket F, Okhla Phase-I
Okhla Industrial Area
New Delhi - 110020, India
Phone : 011 - 40703001